Pump Introductions
03. 11, 2024
Stream, sign of quality.
This is not just a slogan, but a principle that we adhere to during our pump manufacturer.
Normally we follow up the process of IQC(incoming quality control), PQC(process quality control), OQC(outgoing quality control).
Have a close look at what we do before a pump is delivered
IQC:
For material incoming quality control, we sort out the raw materials into standard components, special spare parts and key motor parts.
STANDARD COMPONENTS includes:
Mechanical Seal, Bearing, Fan, Fan Cover, Venturi Tube/Diffuser, Bolts.
SPECIAL COMPONENTS includes: impeller, casting ,capacitor
MOTOR PARTS includes: Stator housing, stator, rotor
Take Mechanical Seal as example, we do inspection from below points.
Bearing part:
Inspection Item:surface, inner diameter, outer diameter, height
Method: eye view, inner diameter gauge, micro-calliper, calliper
Standard: no defect, right size.
FAN Part:
Inspection item: model, surface
Method: eye view
Standard: right model, surface clean, no shrinkage, no dirt, etc
Diffuser Part Inspection Item: Surface,diameter,specification Method: Visual,vernier caliper,drawing Standard:Surface clean,no shrinkage,no burrs,consistent with the drawing | |
VENTURI Inspection Item:appearance,clean,inner diameter Method:Visual,inner caliper,vernier caliper Standard:model correct,appearance clean,drawing |
Thermal Protector:
Inspection Item:specifications
Method:visual, temperature test, current test
Standard:17AM/140℃(35A5)17AM/120 ℃(31A5)21AM/165 ℃
Terminal Box:
Inspection Item:appearance, strength
Impeller
Inspection Item: surface, specifications, outer dia, flow channel
Pump Body
Inspection Item:size, appearance, inlet inner dia, plug screw size
Pump Bracket
Inspection Item:surface, spigot specification, bearing, mechanical seal
Capacitor
Inspection Item:size, capacity(μF)
The motor is a crucial component and the heart of a pump that cannot fail. At Stream, we take our motors very seriously. We heat our stator housing to 140 degrees and shrink them on to the stator to eliminate the chance of movement that can lead to failure.
Stator Housing
Inspection Item:surface, specifications, inner dia.
Motor Rotor
Inspection Item: size, appearance, dia, bearing spot, mechanical seal spot, impeller spot, shaft distance, length, concentricity.
Motor Stator
Inspection Item: surface, outer dia., stator length, inner dia.
The above are the main steps of raw materials incoming quality control.
As for process control, we execute the inspections from below parts:
Assembly Inspection
Performance Inspection
Pressure Tightness Inspection
Packing Inspection
ASSEMBLY INSPECTION
Spare parts double inspection, castings and pump body double inspection,
Water leakage test, noise test
PRESSURE TIGHTNESS INSPECTION
PUMPING TEST
PERFORMANCE INSPECTION
PACKAGE TEST
Inspection Item:painting color/ surface / spare parts/ operating/ voltage test
Method of Inspection:visual/ voltage testing equipment/ parameter equipment
Criteria of Inspection:consistency with the requirements of the painting color and spare parts/ painting even and no varnished/ pump operating without noise, viberation or breakage/ qualified unload current and power rate
1~ 1800v/1s、3~2100v/1s without breakdown
Special Test By Requests
LEAKAGE TEST for mechanical seal
Inspection Item:Mechanical seal
Standard:continuous pumping without leakage
SALINE TEST for anti-rusting castings
Inspection Item:anti rust casting performance in salty water
You can depend on Stream for quality and reliability. What you concern, we solve it for you.
Previous: None
Address
No.17 XeDa Jimei Ind. Park, Xiqing Economic Development Area, Tianjin, China
Telephone
+86 22 8418 0992/3/5
QUICK LINKS